Navigate the complexities of standard form construction contracts with our specialised guidance. Grasp the essentials of JCT, NEC, and FIDIC contracts, ensuring compliance and efficiency in project delivery. Tailored for legal professionals, this topic covers how to effectively mitigate risks, manage obligations, and streamline contractual negotiations in the construction landscape.
The following Construction news provides comprehensive and up to date legal information on Construction weekly highlights—26 June 2025
What are preliminaries in a construction contract?What are prelims?‘Preliminaries’ in a construction contract, or ‘prelims’, is typically taken to...
What is a variation on a construction project?A variation (sometimes referred to as a change) is an alteration to the scope of work originally...
Time of the essence—construction contractsWhat does time of the essence mean?Where time is 'of the essence' it means that the stated time for...
Product liability insurance for the construction industryThis Practice Note looks at product liability insurance from the perspective of those engaged...
JCT collateral warrantiesA collateral warranty is a contract which is collateral to, or sits alongside, the underlying or primary contract (ie the construction contract or consultant's appointment). Most collateral warranties refer to the duties and obligations set out in the underlying contract and
FIDIC contracts 2017—Dispute Avoidance/Adjudication BoardsThis Practice Note considers the use of Dispute Avoidance/Adjudication Boards (DAABs) in the FIDIC Red, yellow and Silver Books 2017. These contracts all provide for disputes to be referred to a DAAB, which issues a binding decision. The DAAB
JCT contracts—variationsThis Practice Note looks at how variations are dealt with under the main forms of JCT contract. For a wider discussion on variations, including reference to relevant case law, see Practice Note: What is a variation on a construction project?This Practice Note looks at the JCT
NEC contracts—interpreting the list of compensation events (clause 60)This Practice Note examines and provides commentary on the list of compensation events contained in clause 60 of the NEC3 and NEC4 engineering and construction contracts (NEC3 ECC and NEC4 ECC). It looks at how the different