Table of contents
- Inspector’s reasoning was adequate
- No procedural unfairness when dealing with expert evidence
Article summary
An inspector’s report refusing planning permission was adequately reasoned; there was no procedural unfairness. The inspector’s failure to fully deal with the evidence did not amount to a breach of justice; it was obvious that he disagreed with it.
To continue reading this news article, as well as thousands of others like it, sign in with LexisNexis or register for a free trial