Ofgem has launched a consultation on proposed licence changes to facilitate the implementation of the Target Model Options (TMO4+) connections reform. The consultation seeks stakeholder feedback on proposed amendments to the Electricity System Operator, Transmission, Distribution, Generation, and Interconnector licences. These changes are designed to align with the new gated connections process outlined in the proposed TMO4+ code modifications and methodologies, aiming to streamline the connections application procedure and replace the current first-come-first-served approach. In addition, new licence conditions are proposed to require the National Energy System Operator to develop and maintain three new connection methodologies. Ofgem intends to publish decisions on the full connections reform package, including licence changes, code modifications, and methodologies, in the first quarter of 2025. The consultation closes on 6 January 2025.