On what basis must a draft supplementary planning document be made available for a period of at least three months?

read titleRead full title
Published on LexisPSL on 21/08/2019

The following Planning Q&A provides comprehensive and up to date legal information covering:

  • On what basis must a draft supplementary planning document be made available for a period of at least three months?

On what basis must a draft supplementary planning document be made available for a period of at least three months?

In England, the preparation and adoption of supplementary planning documents (SPDs) is governed by the Town and Country Planning (Local Planning) (England) Regulations 2012 (TCP(LG)R 2012), SI 2012/767.

TCP(LG)R 2012, SI 2012/767, reg 12(a) requires the local planning authority (LPA), before adopting an SPD, to prepare a statement setting out