Q&As

A local planning authority has received a request for modification of a made neighbourhood plan. The Planning Practice Guidance and the Neighbourhood Planning (General) Regulations 2012, SI 2012/637, reg 18A(3) require for the draft plan to be made within five weeks from the receipt of the examiner’s report or other time that may be agreed. Does the process of making the draft plan require a referendum in such instance?

read titleRead full title
Published on LexisPSL on 17/11/2020

The following Planning Q&A provides comprehensive and up to date legal information covering:

  • A local planning authority has received a request for modification of a made neighbourhood plan. The Planning Practice Guidance and the Neighbourhood Planning (General) Regulations 2012, SI 2012/637, reg 18A(3) require for the draft plan to be made within five weeks from the receipt of the examiner’s report or other time that may be agreed. Does the process of making the draft plan require a referendum in such instance?

The Neighbourhood Planning (General) Regulations 2012, SI 2012/637, regs 14–20 set out the procedural requirements for modifying an existing neighbourhood development plan (NDP). This streamlined procedure applies where proposed modification(s) to an NDP which is already in force would materially affect the policies in the plan, but would not be so significant or substantial as to change the n

Related documents:

Popular documents